Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 25 —

Step Type:

Drag to rearrange

From the previous steps, you should have already tested the electronics and motors before closing up the tube.

Unplug the DB-25 connector.

Make sure the main tube is clean.

Check that the o-ring are clean and lubricated and place them on both the endcaps.

Align the E-Chassis as shown in Fig 1. Plug the DB-25 back into the controller board. Be sure all of your wires are tucked away and there is nothing obscuring a smooth slide down of the tube.

Slide the tube down the electronics chassis and onto the endcap.

Place the other endcap on the other side of the tube. It should mirror the other endcap.