Skip to main content

Site Navigation

Your Account

Choose Language

Help
Editing Step 34 —

Step Type:

Drag to rearrange

Cut three 35mm-long lengths of the larger diameter blue shrink tubing and place one over the wire leads for each motor. The initial diameter of the blue shrink tubing will make a pretty tight fit over the three smaller pieces of shrink tubing, but with the right coercion, should be able to slide most of the way to the motor.

TIP: Mark the wires I II & III so you know which wire(s) to pull as it is VERY tight fit. Use silicon spray which allows the blue shrink to slide over the 3 wires

The blue shrink tubing does not require as much heat as the black tubing. In fact, if you shrink it down too much, it may start to split, in which case it should be replaced (there should be enough extra blue tubing to make a few mistakes)

Once you've done these steps for all three motors, they are ready to be part of the ROVs wire harness!