Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #35

Edit by OpenROV (Sofar)

Edit approved by OpenROV (Sofar)

Before
After
Unchanged

Step Lines

[* black] Insert wisdom here.Once the new motor leads have been attached and the potting in the battery tubes has cured, a wire harness can be built which will eventually pass into the Electronics Tube through the ROV's port endcap.
[* black] The first step to preparing the wire harness is marking the point that will pass through the end cap on each wire lead
[* black] Using a permanent marker, make clear indications of the lengths shown in the diagram for each motor (42cm for what will end up being the port motor, 38cm for the vertical motor, and 35 for the starboard motor).
[* icon_note] Marks should be made on each of the three lead wires for each motor to prevent any one wire being to short or to long
[* black] Insert wisdom here.Once the new motor leads have been attached and the potting in the battery tubes has cured, a wire harness can be built which will eventually pass into the Electronics Tube through the ROV's port endcap.
[* black] The first step to preparing the wire harness is marking the point that will pass through the end cap on each wire lead
[* black] Using a permanent marker, make clear indications of the lengths shown in the diagram for each motor (42cm for what will end up being the port motor, 38cm for the vertical motor, and 35 for the starboard motor).
[* icon_note] Marks should be made on each of the three lead wires for each motor to prevent any one wire being to short or to long