Changes to Step #21
Edit by OpenROV (Sofar) —
Edit approved by OpenROV (Sofar)
- Before
- After
- Unchanged
Step Lines
[* black] Thread a second 1m long wire through the bigger hole on the spring terminal (the one with the lip). |
[* black] Run the lead wires through the aft battery endcap inner disk (it’s the one with two holes that looks like a button) |
[* black] Glue the spring terminal to the inner aft battery endcap disk. |
[* black] Align and glue outer and middle disks of aft endcap. It’s important that it lines up correctly - the nub of the middle disk accenting the hole on the outer disk. |