Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #21

Edit by OpenROV (Sofar)

Edit approved by OpenROV (Sofar)

Before
After
Unchanged

Step Lines

[* black] Thread a second 1m long wire through the bigger hole on the spring terminal (the one with the lip).
[* black] Run the lead wires through the aft battery endcap inner disk (it’s the one with two holes that looks like a button)
[* black] Glue the spring terminal to the inner aft battery endcap disk.
[* black] Align and glue outer and middle disks of aft endcap. It’s important that it lines up correctly - the nub of the middle disk accenting the hole on the outer disk.

Image 1

No previous image

Added

Image 2

No previous image

Added

Image 3

No previous image

Added