Changes to Step #31
Step Lines
[* black] Now that the epoxy in your endcap has had a little time to cure, we can get ready to add the DB-25 connector to the end of the wiring harness that passes through the endcap. |
[* black] Start by removing the tape that was used to hold the bundle together |
[* black] Next, measure a distance of 17cm from the inside surface of the endcap, and cut one of the wires from the bundle at that length. Measure twice, cut once- you don't want the harness to be too long or too short by more then about 1cm! |
[* black] Use the one wire that you've cut as a guide to cut all the remaining wires in the bundle to the same length |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added