Skip to main content

Site Navigation

Your Account

Choose Language

Changes to Step #31

Edit by Zack

Edit approved by Zack

Before
After
Unchanged

Step Lines

[* black] Now that the epoxy in your endcap has had a little time to cure, we can get ready to add the DB-25 connector to the end of the wiring harness that passes through the endcap.
[* black] Start by removing the tape that was used to hold the bundle together
[* black] Next, measure a distance of 17cm from the inside surface of the endcap, and cut one of the wires from the bundle at that length. Measure twice, cut once- you don't want the harness to be too long or too short by more then about 1cm!
[* black] Use the one wire that you've cut as a guide to cut all the remaining wires in the bundle to the same length

Image 1

No previous image

Added

Image 2

No previous image

Added

Image 3

No previous image

Added